University of La Verne - Abraham Campus Center
La Verne project: 45,000 SF 3 1/2 story student center, complete ground up construction consisting of structural steel frame, aluminum curtain wall exterior, cooper clad walls, soffitts and columns, extensive interior finishes.

view pictures
Scripps College
86,000 S.F. Subterranean parking garage. Structural concrete sheanwalls, beams, pre cast plank deck. 27,456 S.F. Athletic Facility, structural concrete basement walls, shoned structural concrete decks and floors, extensive site concrete improvements.
view pictures
Chino Valley Fire Station
10,856 S.F. fire station. Building concreate foundations, apparatus floors, site concreate paving and site work.
view pictures
City of Montclair Police Deptment
38,652 S.F. police headquarters facility. Structral concreate foundations, slabs concreate over metal decking.
view pictures
Brea Unified School District
Science classroom building. 22,465 S.F. two story precast tilt u, construction and site concreate improvements.

view pictures
Union Bank of California
Ontario project: 26,840 SF. Two Story office buliding, complete ground up construction consisting of structual steel frame, brick veneer and metal clad exterior. Interior improvments for bank and common space.

view pictures
Hyssop Industrial Complex
Rancho Cucamonga
Project: 36,000 SF. Concrete tiltup Industrial park, Buliding and site concrete

view pictures
Rochester Business Park
Rancho Cucamonga project: 47,260 SF concrete tiltup Industrial park, building concrete foundations, slabs and precast tiltup wall panels.

view pictures
Rosebowl
Rose Bowl Locker Room Addition: 26,589 s.f subterranean locker room , structural foundation system, shotcrete exterior foundation walls, precast structural deck and topping slab, cast circular raised planter walls and site concrete.

view pictures
Empire Towers
Empire Towers Project: 152,000 s.f. five story mid rise office building, structural foundations, slabs on grade, concrete over metal decking at elevated floors.

view pictures
Red Hill Country Club
Rancho Cucamonga project: 28,527 SF Clubhouse and cart storage facility, multilevel cast concrete structure and extensive site construction.